Tuesday, September 22, 2020

ROAD CONSTRUCTION/MAINTENANCE

On Collier Boulevard between Green Boulevard and Golden Gate Boulevard expect intermittent lane closures both southbound and northbound from 9 a.m. to 3 p.m., weather permitting, for the duration of the Collier Boulevard Improvements Project which is scheduled to be completed in early winter of 2017. Motorists are advised to stay alert and drive with care.   The speed limit has been reduced to 35 mph on Collier Boulevard from Green Boulevard to Golden Gate Boulevard. Flagmen will be used, as needed, along with electronic message signs, lighted arrow boards, advance warning signs and barricades to assist travelers in this area.

Livingston Road between Radio Road and Pine Ridge Road – On Livingston Road between Radio Road and Pine Ridge Road expect intermittent lane closures for approximately one week between 9 a.m. and  3:30 p.m., weather permitting, as crews continue landscape maintenance in the medians and along the roadsides. Lighted arrow boards, advance warning signs, a rolling truck with signage and barricades are being used to assist travelers in this area.

Palm Street/Commercial Drive/U.S. 41 East Intersection – At the Palm Street/Commercial Drive/U.S. 41 East intersection expect intermittent lane closures in all directions, as well as in turn lanes for approximately one week between 9 a.m. and 3 p.m. and OVERNIGHT between 7 p.m. and 6 a.m., weather permitting, as crews continue maintenance on the traffic signal mast arms. Lighted arrow boards, advance warning signs and barricades are being used to assist travelers in the area.

Vanderbilt Beach Road between Airport-Pulling Road and Collier Boulevard – On Vanderbilt Beach Road between Airport-Pulling Road and Collier Boulevard expect intermittent lane closures both eastbound and westbound for approximately one week from 9 a.m. to 3:30 p.m., weather permitting, as crews continue landscape maintenance in the medians. Lighted arrow boards, advance warning signs and barricades are being used to assist travelers in this area.

WORK BY OTHERS:

Airport-Pulling Road between U.S. 41 East and Radio Road – On Airport-Pulling Road between U.S. 41 East and Radio Road expect northbound traffic to be reduced from three lanes to one lane intermittently for approximately two months OVERNIGHT between 8 p.m. and 6 a.m., weather permitting, as crews working for Florida Power and Light continue work to replace and install power poles. Flagmen will be used, as needed, along with electronic message boards, advance warning signs and barricades to assist travelers in this area.

Warren Street between Carolina Avenue and St. Andrews Boulevard – On Warren Street between Carolina Avenue and St. Andrews Boulevard expect traffic to be reduced to one lane only intermittently for approximately three weeks between 8 a.m. and 7 p.m. Monday through Thursday, and between 8 a.m. and 2 p.m. on Friday, weather permitting, as crews working for Florida Power and Light continue utility work. Flagmen will be used, as needed, along with advance warning signs and barricades to assist travelers in this area.

Summer Rainy Season Advisory

**Do not drive on roads that are under water.  If you cannot see the pavement markings or the edge of pavement it is best not to risk driving into deep water. Turn around, don’t drown. **

**If an intersection is dark, meaning all traffic signals are damaged, missing, or without power, treat the intersection as a FOUR-WAY STOP situation.  However, if drivers approach a signalized intersection where the signal is in flash mode, drivers approaching from the flashing yellow side should proceed with caution and those approaching from the flashing red side need to treat the situation as a stop sign.**

 

 

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *