Friday, September 20, 2019

Lanes shifting for bridge construction June 3rd

“Our Marco Bridge.” First in a series of Marco Memories artwork by local artist Nancy Rhodes. Email Nancy Rhodes at ncrhodes33@cs.com

Tonight (Thursday) June 3rd at 10 PM, the Northbound and Southbound lanes on North Collier Blvd. near the Marco Island Yacht Club (1400 N. Collier Blvd.) will be shifting as part of the bridge construction project on Collier Blvd (SR951).

Lanes will be shifting to the north and temporary delays, while unlikely, are possible.

Drivers are urged to drive slowly, avoid distractions and use caution while proceeding through this area as construction personnel will be working on the roadway.

The Marco Island Police Department will have personnel assigned to this construction zone.

Leave a Reply

Your email address will not be published. Required fields are marked *